Watch the video below to explore how our collaboration with Willerby is helping power the UK’s largest holiday home manufacturer with clean, cost-effective solar energy.
Project Overview
Clean Energy for a Market-Leading Manufacturer
As a company committed to environmental responsibility, Willerby wanted to make its large-scale production site in Hull more sustainable. C3 Group designed a solar PV system tailored to the site’s energy profile – delivering on-site generation with minimal disruption to manufacturing.
What We Did
Technical Design Backed by Seamless Delivery
C3 Group developed the system and collaborated with our partner, GW Power, to complete installation across key rooftops on the Willerby site.
Scope of Work:
- 91.125 kWp solar PV array
- 225 panels installed across operational buildings
- Designed to produce 74,800 kWh annually
- Estimated savings of £20,952.66 per year
The system was engineered to integrate cleanly with the site’s existing electrical infrastructure and operational flow.
The Results
Operational Savings, Strategic Carbon Reduction
Willerby now benefits from a renewable energy system that contributes to on-site electricity needs, reducing reliance on the grid and supporting its low-carbon product promise.
This system directly aligns with Willerby’s sustainability goals and its ambition to innovate with purpose across both product design and operations.
Work With C3 Group
Want to Future-Proof Your Site?
C3 Group works with manufacturers and private sector leaders to deliver solar, storage and low-carbon upgrades – from feasibility to delivery.
Let’s talk about your clean energy strategy.
Get in Touch